Summer
So the framing has finally begun!!!
The Beam sat perfectly on the dead man I built, (the temp post to my left).
The Ground floor will be done in 3 weeks. This part is taking some extra time, I need to use a laser,(a string line would work) to get cut numbers so that no matter how far off the Block is the Floor will be perfect.
I set a Joist on top and ran it down the full length, Hit all 3 spots consistently.
Lots of pics on my Home Page, If you are not on my Friends list please add me but do make sure to add Nude Construction in the mesg. I never accept blank requests.
Thanks,
Mick
.